2nd Day All Terrain G Force Landing Gear Upgrade.
by
on 07-02-2010 at 06:37 PM (342 Views)
Last Pic first...got them back to front again..
Day 2 started with removing the axle tube bracket from the underside of the keel, cleaning it up.
G Force has a parallelogram axle arrangement. So there is an upper axle bracket to install separated from the keel by a spacer, same for the underside axle bracket. A spacer is inserted here too.
Original holes were 3/16" and had to be drilled out to 1/4".
The G Force release mechanism is located at the rear of the upper main axle bracket.
Here is a before and after install pics.








